Bathroom installation in Ealing W7

TipTop Builders offer top quality Bathroom Installation services in Ealing W7. We provide Free Visit, Advice and Quotation !

Bathroom Refurbishment labour cost quotation includes:

  1. Demolition works (removing old bath, sink, toilet, shower, wall and floor tiles)
  2. Preparation works (making good walls and floor, levelling and plastering)
  3. Plumbing works (feed for shower mixer, bath taps, basin taps, toilet) and waste pipes installation.
  4. Tiling walls and floor.
  5. Installation of new bath or shower-enclosure, toilet, basin, towel rail radiator.
  6. Fixing cabinets, mirror and other stuff.
  7. Removing all building rubbish from the property.

TipTop Builders also can help you to get all building materials like adhesive, paint, pipes, connectors, grout, plaster, silicon, etc. You can save around 10% on materials cost with us – we get some building materials for trade prices from big stores.

Please, have a look photos of completed Bathroom Refurbishment in Ealing  W7. This project took us almost 4 weeks to complete. Customer supplied all items like bath, basin, toilet, shower and tiles and newly refurbished bathroom looks like a posh spa.

Before, existing bathroom:

Half way done:

Completed bathroom refurbishment:

Leave a Reply

%d bloggers like this: