Bathroom Refurbishment Twickenham TW2

Bathroom Renovators Twickenham

TipTop Builders can help to renew your bathroom, shower-room or walk-in-shower.

Usually it take us up to 3 weeks to get everything done. Here is step by step description how we deal with bathroom refurbishment:

  1. Cover furniture and other items with dust sheets, place special floor protection on wooden and carpet flooring.
  2. Disconnect power supply and water supply in the bathroom.
  3. Removing old bath, basin, toilet, wall and floor tiles, old electrics, old pipes, etc.
  4. Provide new hot, cold water supply and new waste pipes installation.
  5. Plastering ceiling and walls.
  6. Painting ceiling and walls.
  7. Laying plywood sub-floor.
  8. Laying wall and floor tiles.
  9. Installation of new bath, basin, shower mixer, taps, toilet, etc.
  10. Apply grout and silicon.
  11. Cleaning, removing and disposing all building rubbish.

Please, have a look photos BEFORE and AFTER of the Bathroom Refurbishment in Twickenham, TW2.

Existing Bathroom – before refurbishment:

After refurbishment: 

We spent a bit more than 3 weeks to complete all works. Extra time was spent on levelling uneven floor, installation of new PVC window and wallpapering. Customer supplied very good quality rubber laminate, which is 100% water resistant and will last for ages. Would you like to renovate your bathroom ? – give us a call and we can help you to get it done quickly and professionally.

Leave a Reply

This site uses Akismet to reduce spam. Learn how your comment data is processed.

%d bloggers like this: