
Project Details
TipTop Builders Ltd completed a full kitchen installation and refurbishment project in Teddington, TW11, transforming an outdated kitchen into a modern open-plan living space. The project included kitchen removal, structural alterations, new kitchen installation, electrical and plumbing works, splashback tiling, decorating, and new flooring throughout the ground floor.
Project Year: 2025
Renovation Timeline: 4 weeks
Location: Teddington TW11
SCOPE OF WORKS: Kitchen installation, refurbishment, structural alterations, plumbing, electrics, tiling and flooring works.
Project Cost: £18,500
What We Did
- Removed the existing kitchen units, worktops, sink, hob, oven, wall tiles and flooring.
- Removed part of the internal wall between the kitchen and dining room to create an open-plan kitchen layout.
- Prepared walls and ceilings, followed by professional decorating with two coats of emulsion paint.
- Installed new kitchen units, doors, drawers, handles, plinths, end panels and worktops.
- Completed splashback tiling above the worktops with grout and silicone finishing.
- Adjusted electrical wiring and installed connections for kitchen appliances including oven, hob, extractor, dishwasher and washing machine.
- Modified plumbing pipework and installed the new sink, mixer tap, service valves, dishwasher and washing machine.
- Removed old carpets and installed approximately 40m² of laminate flooring across the kitchen, dining room, living room and hallway.
- Completed finishing details including white scotia trim and waste removal.
Final Outcome
The completed kitchen installation in Teddington TW11 has created a stylish and functional open-plan space perfect for modern family living. The new fitted kitchen, improved layout, quality finishes and continuous flooring have transformed the property into a bright, practical and contemporary home.
Some of Our Latest Work
Past Projects
Under-stairs toilet installation in Teddington TW11, turning a storage area into a bright, practical downstairs WC with a space-saving toilet, integrated basin and tap.
Timber decking replacement in Maida Vale W9, transforming a weathered terrace with a new supporting frame, grooved timber boards and matching entrance steps.
Bathroom refurbishment in Twickenham, TW2, completed by experienced bathroom fitters, including new bathroom installation, tiling and wall panelling










